Working Experiences

Experienced of around more than 10200 Successful Works in Bangladesh. High Skilled and well trained and Motivated 200 Professionals and Workers with Proven Track Record. We have 3 nos of warehouses all over Bangladesh; Natore, Rangpur and Feni warehouse having more than 1800 Sqft area in each. Moreover we have own transportation facilities to and from site to warehouse.

Product
Installation Material manufacturing
Importer Installation and consumable items for Telecommunication services
Importer of measuring equipments
Solo Distributor of Cables (Hansol)
Solo Distributor of Hand Tools (Yato)

Service:

RBS (Ericsson- Model 2106i, 2206, 2206V2, 2308, 2216, 2111, 6101, 6202, 6601)
BTS (Huawei 3900 BTS)
Microwave Link (Minilink TN, Minilink E, Huawei RTN, Marconi Long Haul, Marconi MDRS 155 (EC & S) for SDH
link, IPASSO,PASOLINK, PASOLINK +, PASOLINK NEO/c, SRAL, SRAL XD, MINILINK)
Site Acquisition, RF, TSS & LoS:
Site Acquisition, RF Survey, TSS and LoS Survey project with IE support.

BTS Installation (2650+)
MW Installation (1700+)
Optical Fiber Cable termination between MUX & ODF, ODF & LTU, LTU & ODF, ODF & MMU
E1 Mapping for both Cascade and Stand alone sites (80+)
Infrastructure and Cost Studies
MW Installation (+)
Equipment survey (2200+)
Vehicle Management (11)
Warehouse Management (3)
Site Surveys, Site Evaluation, Approval and Drive Testing (600+)
AC and Generator supply, install and maintenance
LOS and TSS Survey (3000+)
Up Gradation of Baseline, Up Gradation of Modules
Management / Technical
Core Networking / Switching (10+)
Project Management
Cost Management
Multiplexer (10+)
Site Acquisition (40+)

Acknowledged best services team from our custom 

Our Experiences with

quota   

We have a good experience with world and local top class companies.

* Ericsson  * Edotco  * Robi  * Airtel  * Grameen Phone  * Teletalk  

Our Experiences on

Experienced of around more than 15000+ Successful Works.

High Skilled and well trained and Motivated 200 Professionals.

  • BTS Installation (4650+)
  • MW Installation (3700+)
  • Optical Fiber Cable termination between MUX & ODF, ODF & LTU, LTU & ODF, ODF & MMU
  • E1 Mapping for both Cascade and Stand alone sites
  • Infrastructure and Cost Studies
  • Power Maintenance for BTS
  • Equipment survey (3200+)
  • Vehicle Management (11)
  • Warehouse Management (3)
  • Site Surveys, Site Evaluation, Approval and Drive Testing (600+)
  • AC and Generator supply, install and maintenance
  • LOS and TSS Survey (4000+)
  • Up Gradation of Baseline, Up Gradation of Modules
  • Management / Technical
  • Core Networking / Switching (10+)
  • Project Management
  • Cost Management
  • Multiplexer (10+)
  • Site Acquisition (40+)